Schematic through to Construction phases of the Madar Discovery Centre, phase 1 of the Al Jada development Central Hub by Arada. Full coordination and technical reviews with the London-based design architect, New York-based lighting designer, local engineering, and site teams. Assisted the client and design architect with product and manufacturer selection through to contractor evaluation and appointment. Site and office-based once construction commenced ensuring that the building was delivered to the design intent.